Trial results

Consolidated results from independent labs and customer trials in North America and Europe — ready-mix, precast, and fly ash/GGBS blends.

159%

8-hour strength gain

Precast Mix 201 — 3× daily mold turns

+2,204 PSI

Best 28-day gain

50/50 OPC/GGBS blend vs. 5,365 PSI control, independent lab

+1,827 PSI

Best fly-ash blend gain

28 days, dosage constant across blends

−50%

Cementitious content

While still gaining at 28 days

Tested by
SGS TECIdeal LaboratoryKCT Laboratory
The same data we share with commercial customers
Filter

1Independent Lab

Independent Lab

Third-party laboratory testing across fly ash and GGBS blended mixes — the same protocols we share with commercial customers.

Fig. 1PSI · open dataset

Independent Lab Testing

Increased Fly Ash Benefit Results

Holding total cementitious content fixed at 1,010 lb/yd³, fly ash was raised from 22% to 33% of the blend—replacing more cement each step. Normally that means weaker concrete. With Trident, every blend gained large amounts of strength.

Fly Ash % = fly ash as a share of total cementitious content (cement + fly ash = 1,010 lb/yd³ in every mix). Trident dosed at ~1 oz/yd³ where used. More fly ash normally lowers strength—especially early—because it replaces cement.

+1,827 PSI

Best 28-day gain

At 21.7% fly ash, Trident vs. its control

+1,450 PSI

28-day gain at 33% fly ash

Largest fly ash blend tested—gains still hold

+25%

33% FA beats 22% control

Trident at the highest fly ash blend (6,076 PSI) tops the lowest-fly-ash control (4,843 PSI)

3-Day
Control
Trident
PSI
Δ +1,435 PSI at 33.3% FA · peak gain
7-Day
Control
Trident
PSI
Δ +1,450 PSI at 21.7% FA · peak gain
28-Day
Control
Trident
PSI
Δ +1,827 PSI at 21.7% FA · peak gain

Full dataset

Fly Ash %SampleDate3-Day PSIvs. Control7-Day PSIvs. Control28-Day PSIvs. ControlSlump
21.7%Control8/13/20252,9443,6544,8434.7
21.7%Trident (~1 oz/yd³)8/13/20254,075+1,131 PSI5,104+1,450 PSI6,670+1,827 PSI4.7
27.5%Control8/13/20252,7553,3354,7424.9
27.5%Trident (~1 oz/yd³)8/13/20253,814+1,059 PSI4,582+1,247 PSI6,322+1,581 PSI4.7
33.3%Control8/18/20252,5963,4514,6265.1
33.3%Trident (~1 oz/yd³)8/13/20254,031+1,436 PSI4,742+1,291 PSI6,076+1,450 PSI5.5

Fig. 2PSI · open dataset

Independent Lab Results

GGBS 50/50 Mix — Compressive Strength Over Time

50% OPC / 50% GGBS blend · F01 dosage variants vs. control at 1, 7, and 28 days · Control mix reached 5,365 PSI at 28 days

+2,204 PSI

Best 28-day gain

F01 — 32 oz/yd³ vs. 5,365 PSI control

7,569 PSI

Peak 28-day strength

F01 — 32 oz/yd³

+1,381 PSI

Best 1-day gain

Critical for precast

Control
F01 — 16 oz/yd³
F01 — 22 oz/yd³
F01 — 27 oz/yd³
F01 — 32 oz/yd³
PSI
Δ +2,233 PSI at 7-Day (F01 — 32 oz/yd³) · peak gain

Full dataset

Dosage1-Day PSIvs. Control7-Day PSIvs. Control28-Day PSIvs. Control
Control2,8973,3935,365
F01 — 16 oz/yd³3,364+467 PSI4,147+754 PSI6,003+638 PSI
F01 — 22 oz/yd³3,553+656 PSI4,539+1,146 PSI6,482+1,117 PSI
F01 — 27 oz/yd³3,959+1,062 PSI5,003+1,610 PSI6,989+1,624 PSI
F01 — 32 oz/yd³4,278+1,381 PSI5,626+2,233 PSI7,569+2,204 PSI

2Customer Trials

Customer Trials

Producer-run trials in real plants, with real mix designs, at commercial scale — North America and Europe.

Fig. 3PSI · open dataset

Customer Trials — Europe

European Producer R&D — Trident Dosage Trials

Multiple mix designs · PSI results at 1, 7, and 28 days

+1,175 PSI

Best 28-day result

F01 — 16 oz/yd³ in producer-validated mix

+1,218 PSI

Best 7-day gain

Meaningful for schedule-driven projects

Zero

Workability impact

Slump and air content maintained

Control
F01 — 16 oz/yd³
F01 — 22 oz/yd³
PSI
Δ +1,218 PSI at 7-Day (F01 — 16 oz/yd³) · peak gain

Full dataset

Dosage1-Day PSIvs. Control7-Day PSIvs. Control28-Day PSIvs. Control
Control9574,7716,728
F01 — 16 oz/yd³1,131+174 PSI5,989+1,218 PSI7,903+1,175 PSI
F01 — 22 oz/yd³1,131+174 PSI5,844+1,073 PSI7,497+769 PSI

Fig. 4PSI · open dataset

Customer Trials — North America

Ready-Mix Client — Fly Ash Substitution Trial

Trident DCA 6 conducted with a 5% reduction in total cement and fly ash content · Type F fly ash

−5%

Cement reduction

5% less cement and fly ash — and still stronger at every age

+980 PSI

28-day gain

Trident DCA 6 vs. control

+420 PSI

7-day gain

Trident DCA 6 vs. control

Control DCA 6
Trident DCA 6
PSI
Δ +980 PSI at 28-Day · peak gain

Full dataset

Trial IDDosage (oz/cwt)7-Day PSIvs. Control28-Day PSIvs. ControlSlumpAir Content
Control DCA 603,2004,2464.5"0.90%
Trident DCA 64.7823,620+420 PSI5,226+980 PSI4"1.10%

3Precast

Precast

Early-strength development trials with precast producers — where hours saved translate directly into mold turns.

Fig. 5PSI · open dataset

Precast Client — North AmericaFeatured result

2025–2026 Cumulative Cylinder Testing

Mix 201 · Poured 20-Feb · Batch #235639 @ 7:15 AM · Stripped 2/16/2026

159%

8-hour strength gain

Triple mold turns per day

Production capacity

vs. industry standard of 1 turn/day

$0

Capital investment

No equipment changes required

Control Avg
Trident Avg
PSI
Δ +1,709 PSI at 8h · peak gain

Full dataset

Elapsed TimeControl Avg (PSI)Trident Avg (PSI)Gain% Improvement
8 hours1,0772,786+1,709 PSI159%
10 hours3,1024,292+1,190 PSI38%
12 hours3,9804,704+724 PSI18%
24 hours6,8757,598+723 PSI11%
7 days7,4878,186+699 PSI9%
14 days8,3948,836+442 PSI5%
28 days8,3629,396+1,034 PSI12%

159% strength gain at 8 hours enables triple mold turns per day vs. the industry standard of 1—effectively tripling precast production capacity with no capex.

Fig. 6PSI · open dataset

Precast Customer — USA

Precast Mix — Compressive Strength Development

12 hours to 28 days · Customer spec required minimum 3,500 PSI at 24 hours

3,800 PSI

Best 12-hour result

Batch 3 — spec exceeded 12 hrs early

4,110 PSI

Best 14-hour result

Batch 3 — 38% above spec at 14 hrs

10,980 PSI

Best 28-day result

Batch 4 — consistent high strength

Control
Batch 2 — 24 oz
Batch 3 — 30 oz
Batch 4 — 36 oz
PSI
Δ +1,240 PSI at 14h (Batch 3 — 30 oz) · peak gain

Full dataset

Batch12-Hour PSI14-Hour PSI7-Day PSI28-Day PSI
Control2,7502,8707,22010,130
Batch 2 — 24 oz3,4603,7208,15010,920
Batch 3 — 30 oz3,8004,1108,22010,970
Batch 4 — 36 oz3,6503,7707,67010,980

All Trident batches exceeded the 3,500 PSI specification at 12 hours—12 hours ahead of the customer's 24-hour requirement.